It travels as parts, not as a screen

A sphere, a can or a ribbon leaves the factory in pieces: modules in numbered foam trays, the frame in sections, the controller in a flight case, the power supplies and cabling bagged by run. The crate is not a box around a product; it is built to the shape.

That is the first thing buyers underestimate. A rectangular video wall can be palletised. A 2 m sphere cannot — the cabinet sections are curved, the modules are specific to a row, and if the numbering is lost the install becomes a puzzle.

The crate is built around the shape

Curved sections get plywood cradles cut to the radius, so the cabinet sits on its edge, not on its face. Modules go in EPE foam trays, one row per tray, labelled. The seam map — which module belongs where — travels in a plastic wallet taped inside the lid, because paper taped to the outside gets wet.

We have seen a cheap crate arrive with the sections stacked flat. The bottom cabinet takes the load of everything above it, the curve distorts by a few millimetres, and the modules no longer sit flush. That is not a shipping problem you can fix on site.

Sea or air: the decision is insurance, not speed

Sea freight from Shenzhen to a European port runs roughly 28–35 days door to door; air is 5–8 days. The rate difference on a 2 m sphere is large enough that most buyers choose sea. What actually changes is handling: every extra transfer is a chance for a crate to be dropped or forked.

So the honest answer is: choose air when the opening date is fixed and the schedule cannot absorb a three-week swing; choose sea when you have float, and spend the saving on a proper crate and marine insurance. Insure the full invoice value plus freight, not just the goods.

DDP, CIF, FOB — what you actually control

FOB means the screen is yours once it is on the vessel; the forwarder, duties and the last mile are on you. CIF adds freight and insurance to the port, not to your door. DDP is the one where the price you agree includes duty and delivery, and the seller carries the customs risk.

For a first order, DDP removes the most unknowns, because a mis-declared HS code can hold a crate at customs for a week. For repeat buyers with their own forwarder, FOB is usually cheaper. Pick one and write it into the PO; to be confirmed later is how demurrage appears.

What to inspect before you sign

Open the crate in front of the driver if you can, and photograph the outside before you cut the straps. Check the crate corners for crush marks, because a crushed corner usually means the cabinet inside has taken a hit. Count the module trays against the packing list before you let the driver leave.

Then, within 48 hours, power the screen on a bench. Look for dead pixels, modules that do not light, and fans that are louder than the rest. Report anything in writing with photos while the shipment is still in transit in the insurer's eyes — after you sign clean, the claim gets much harder.

The five things that arrive broken

In our experience the failures cluster: cracked module corners from trays stacked the wrong way; bent frame sections from a crate that was forked rather than lifted; water ingress when a crate sat on a wet dock; dead power supplies after a voltage spike on a generator; and lost numbering, which is not damage but costs a day.

None of these are exotic. All of them are prevented by a crate drawing, a packing list and a five-minute inspection. The screen itself is usually the least fragile thing in the box — the frame and the numbering are what fail.

What to ask before you pay a deposit

Ask for the crate drawing and the packing list before production ends, not after. Ask who books the freight and who owns the insurance. Ask what happens if a module is cracked on arrival — is there a spare in the crate, and how fast can a replacement ship.

A supplier who can answer those three in writing is a supplier who has shipped a shaped screen before. One who says we will handle it is telling you the crate is not drawn yet.