5 m LED Inner Dome — P1.5 to P3
A 5 m hemisphere facing inwards: 39.3 m² of screen, 11.35 M lit pixels at P1.86 and 511 kg of shell.
- 2,500 mm
- 11.35 M at P1.86
- ≥ 600 nits
A dome is a sphere cut by a plane, and the cut decides almost everything. A 6 m base with a 500 mm rise gives 29 m² of screen on a 9.25 m radius; the same base at 3 m rise gives 56.5 m² on a 3 m radius. Same footprint, twice the screen, half the curvature.
A dome is a sphere cut by a plane, so two numbers describe it: base diameter and rise. Radius is (a² + h²) ÷ 2h and area is 2πRh, which means a 6 m base can be 29 m² or 56.5 m² depending on the rise. Lit pixels are area ÷ pitch²: a 5 m hemisphere at P1.86 is 11.35 million, not the 35 million its canvas suggests. Shell weight runs at 13 kg/m² and peak power at 800 W/m².
Most dome enquiries arrive as a diameter, because a diameter is what fits in the drawing. The number that actually sets the price is the rise — how deep the dome is — and it is usually missing. Two domes with the same 6 m base can differ by a factor of two in surface area, and the shallower one is not the cheaper one to engineer, only the cheaper one to fill.
Inside a dome, every cabinet sits on a different radius plane. The band at the rim is nearly vertical, the band at the crown is nearly flat, and the modules between them are cut to different shapes. That is why a dome cannot be built from a curved video wall panel and why the cabinet count, not the square metre price, is what we quote against.
We build three forms from the same geometry: inner domes that people stand under, outer domes that are seen from the street, and caps that hang over a desk or close a ceiling. All of them start with the room: height under the crown, what is already hanging from the slab, and how a technician reaches the top row.
Send a base diameter and we can draw a dome, but we cannot price one. The rise decides the sphere radius, the radius decides how many cabinet types the shell needs, and the cabinet types decide most of the invoice. A 3 m base at 500 mm rise is 7.85 m² on a 2,500 mm radius; the same base at 1,500 mm rise is 14.14 m² on a 1,500 mm radius. One more number in the first email saves a week of drawing.
Stock configurations below. Any diameter, outline or pitch is quoted from your file.

A 5 m hemisphere facing inwards: 39.3 m² of screen, 11.35 M lit pixels at P1.86 and 511 kg of shell.

A 3,000 mm base with a 750 mm rise: 8.84 m² of screen on a 1,875 mm radius, 1.41 M lit pixels at P2.5 and 115 kg.
Any diameter, outline or pitch quoted from your own file. Tooling shown as a separate line so you can see what the shape costs.
Request a quoteTwo domes with a 6 m base can differ by a factor of two in price and neither supplier is wrong. The difference is the rise — how far the shell bulges up from its base plane — and it is the one dimension that rarely appears in a first enquiry.
The formula is old and short: radius R = (a² + h²) ÷ 2h, where a is half the base diameter. A 6 m base with a 500 mm rise gives a 9.25 m radius. The same base at a 3 m rise gives a 3 m radius. The shallow dome is gentler and cheaper per square metre, but it also sits on a radius so large that the cabinets are almost flat — and almost flat is the worst thing to tool, because a nearly flat curved panel still needs a curved mould and gains nothing from it.
The table below is the one we work from. Area moves slowly at first and then very fast: going from 500 mm to 1,500 mm rise on a 6 m base nearly doubles the screen.
| Base | Rise | Sphere radius | Surface area | Cabinets | Shell weight |
|---|---|---|---|---|---|
| 3 m | 500 mm | 2,500 mm | 7.85 m² | 7 | ≈ 102 kg |
| 3 m | 750 mm | 1,875 mm | 8.84 m² | 8 | ≈ 115 kg |
| 3 m | 1,000 mm | 1,625 mm | 10.21 m² | 9 | ≈ 133 kg |
| 3 m | 1,500 mm | 1,500 mm | 14.14 m² | 12 | ≈ 184 kg |
| 6 m | 500 mm | 9,250 mm | 29.06 m² | 25 | ≈ 378 kg |
| 6 m | 1,000 mm | 5,000 mm | 31.42 m² | 27 | ≈ 408 kg |
| 6 m | 1,500 mm | 3,750 mm | 35.34 m² | 30 | ≈ 459 kg |
| 6 m | 2,000 mm | 3,250 mm | 40.84 m² | 35 | ≈ 531 kg |
| 6 m | 3,000 mm | 3,000 mm | 56.55 m² | 48 | ≈ 735 kg |
| 8 m | 1,000 mm | 8,500 mm | 53.41 m² | 45 | ≈ 694 kg |
| 8 m | 2,000 mm | 5,000 mm | 62.83 m² | 53 | ≈ 817 kg |
| 8 m | 4,000 mm | 4,000 mm | 100.53 m² | 85 | ≈ 1,307 kg |
Area = 2πRh, weight at 13 kg/m², cabinets at 1.18 m² each. A rise equal to half the base is a hemisphere; those rows are the last one in each block.
Read the radius column, not the area column, when you are talking to a structural engineer. A 6 m dome on a 9.25 m radius is a shallow dish that pushes outward at the rim; the same footprint on a 3 m radius pushes almost straight down. Those are different steel details and different anchor loads, and the invoice follows the steel.
The instinct is to take a flexible module, bend it over a frame, and call it a dome. It works up to about 2 m and then stops, because on a sphere every horizontal band sits at a different angle and a different radius. A module bent for the rim will not sit flat at the crown, and forcing it there opens the seam at the top, which is the one place everyone looks.
So a dome is built in latitude bands. Each band is tooled for its own angle: the rim band is close to vertical, the band at 45° is cut as a trapezoid, and the crown is a single closure piece. A 5 m hemisphere needs nine module types. A flat wall of the same area needs one.
A dome project has one extra stage compared with a flat screen, and it sits at the front: the room survey, because a dome is the only product where the ceiling it hangs from is part of the specification.
Height under the slab, what is already bolted to it, the sprinkler layout, and the floor loading for whatever lifts into the space. Half of the domes we quote end up 300–600 mm shallower than the architect's render because the slab is lower than the model.
Two numbers. From them we return the radius, the area, the cabinet count and a weight to give the structural engineer. This is usually a two-day turnaround and it is free.
Anything passing through the shell gets a ring in the drawing: chandelier, truss, speakers, smoke detectors. Moving a penetration after tooling starts costs a new module type, not a new hole.
Nine module types for a 5 m hemisphere, two for a 3 m cap. Tooling is the long pole in the schedule — four to six weeks, and it is not something that can be compressed by paying more.
The shell goes together on the workshop floor before it ships, pixel map tested, then it comes apart into numbered crates. Nobody discovers a fit problem at 8 m on a scissor lift.
We hand over the mapping project with the screen. The first piece is normally rendered by us from the client's footage so the commissioning week is spent on brightness and geometry, not on teaching an agency what a dome master is.
Inner, ceiling and cap are the same geometry and completely different products once you get to structure and service. The mistake is choosing by shape instead of by where people stand.
| Form | How it is fixed | Who sees it | Service route | Where it belongs |
|---|---|---|---|---|
| Inner dome | Crown ring to slab or truss, rim free | Audience standing inside | Scissor lift from the floor | Planetarium, flight theatre, simulator |
| Ceiling dome | Rim ring into the soffit, crown braced back | Everyone walking below | Lift, front service | Mall atrium, hotel lobby, rotunda |
| Cap over a desk | Stand, rim frame, or a recess in the ceiling | People looking up while passing | Step ladder | Reception, oculus surround, stand canopy |
| Outer dome | Meridian ribs to a base ring, weather skin | The street | Rope access or scaffold | Landmark, fuel station, park entrance |
An outer dome is not an inner dome turned around. On the outside, every rib, cable tray and service gap is on the face people look at, so the shell has to be clad — and a clad shell costs about 40% more than the same screen indoors.
A supplier who quotes "8,445 × 4,223" for a 5 m dome at P1.86 is describing the canvas, not the screen. That canvas is what the media server renders and what your content team works in; the LEDs that actually exist number 11.35 million, because a hemisphere's area divided by the pitch squared is a smaller number than its azimuthal unwrap.
Both numbers matter, for different people. The canvas decides the server, the graphics card and the file size. The lit count decides the receiving cards, the power and the price. We put both on the drawing so nobody has to reverse-engineer which one they were given.
| Form | Area | Peak power | Average power | kWh a year at 12 h/day |
|---|---|---|---|---|
| 3 m cap, 750 mm rise | 8.84 m² | 7.1 kW | ≈ 2.3 kW | ≈ 10,100 |
| 5 m hemisphere | 39.3 m² | 31.4 kW | ≈ 10.2 kW | ≈ 44,700 |
| 6 m hemisphere | 56.5 m² | 45.2 kW | ≈ 14.7 kW | ≈ 64,400 |
| 8 m hemisphere | 100.5 m² | 80.4 kW | ≈ 26.1 kW | ≈ 114,300 |
Peak at 800 W/m², average at about a third of that for normal content. Multiply the last column by your own tariff — a figure in dollars would only tell you about our electricity.
The 5 m dome is the one that surprises people. Forty-five megawatt hours a year is a small office building, and it lands on the venue's bill, not on ours. If the dome is going to run all day in a mall, the conversation about average-brightness content starts before commissioning, not after the first invoice.
Three that come up on almost every dome enquiry. Ask us anything else directly.
A dome is quoted from the opening diameter and the sphere radius it belongs to. Tell us whether it is the full upper hemisphere or a segment, and how it will be carried from above.
We reply within one working day. Drawings can follow by email.
Those two numbers decide the pitch, the cabinet count and most of the price. Send them and we will come back with a build.
On a phone: long-press the code, save it, then open WeChat → + → Scan → pick it from your album. On a desktop, scan it straight off the screen.